Preservation and Protection of the Prizrenasja Hydro Power Plant

Key Activity: Structural Restoration: Reinforced and repaired the building’s structure to ensure safety and longevity.

Exhibit Development: Curated and installed exhibits detailing the history of electrification in Kosovo and the role of the Prizrenasja Hydro Power Plant.

Main Beneficiaries: Residents of Prizren and Kosovo, who benefit from the preservation of a significant industrial heritage site.

Students, researchers, and tourists interested in the history of electrification and industrial development in the region.

Timeline: 2012-2014

Funding: U.S. Embassy’s Ambassadors Fund for Cultural Preservation (AFCP)

Location: Municipality of Prizren

Main Project Objectives

  • Restore and conserve the Prizrenasja Hydro Power Plant, Kosovo’s first hydroelectric power station, to preserve its industrial heritage.
  • Rehabilitate the facility to function as the Museum of Hydro-Economy, showcasing the history of electrification in Kosovo.

Main Project Outcomes

  • Structural restoration and conservation of the Prizrenasja Hydro Power Plant, maintaining its historical integrity.
  • Reestablishment of the facility as the Museum of Hydro-Economy, providing educational exhibits on Kosovo’s electrical history.

Latest Posts